Sunday, 18 May 2008

Production Scheduling End of Weeks 5 and 6

Despite the earlier success of my schedules in Excel I have been asked to use MS Project to try and enhance the quality of my time planning. I have mocked up a new schedule using this software as you can see below




The screenshots above show the production schedules for the past 2 weeks. These show the work that I was aiming to achieve during weeks 5 and 6. Generally I kept to most of my tasks to date. There was the setback of redo-ing pre-production work for Nickelodeon but this is all part of the design process and I have integrated time in for these changes and you can see the percentage of work done also decreased as I had to redo areas for the animation. I also readjusted the scheduling of the Veronica work as I was losing ground on this but I did manage to make better headway with other areas such as Contextual Studies, PPD, and my showreel unit.

No comments: